Project Highlights - Chandler Magnet School

Chandler Magnet School | Worcester MA

  • Owner
    Worcester Department of Public Works

  • Architect
    T2 Architecture | Marion, MA

  • General Contractor
    J.J. Cardosi | East Providence, RI
  • Lockheed Window Corp. Project Manager
    John Kroll

The project consisted of replacing 947 steel windows in 309 openings utilizing the Graham Thermal GT6200 Fixed Over Project In Window Systems. All windows were glazed with triple pane insulated glass with dual Low E coatings.

Installed components included:

  • Replacement of 947 steel windows in 309 openings utilizing the Graham Thermal GT6200 Fixed Over Project In Window Systems.
  • All windows were glazed with triple-pane insulated glass with dual Low E coatings.
  • All aluminum was finished in a Bone White paint finish.
  • Main entrance also replaced with two sets of EFCO Rugged Stile doors and 9” deep curtainwall system.

Project Highlights