Charlestown High School | Charlestown, MA

  • Owner
    Town of Charlestown School Department, MA
  • Architect
    CBI Consulting | Boston, MA
  • General Contractor
    Chapman Waterproofing | Dorchester, MA
  • Lockheed Window Corp. Project Manager
    John Kroll

The multiple structures of this renovation project included a pedestrian bridge connecting the buildings, a greenhouse building, and a student-run café.

Installed components included:

  • 108 openings fitted with 550 Lockheed Series 6125 Fixed and Fixed over Project-Out window units
  • All material provided in a clear anodized finish
  • Aluminum greenhouse system manufactured by Alumicor, LTD
  • Pedestrian bridge and student-run café renovated with 1″ insulated glass with a Solera colored interlayer of several colors.
  • All classroom and administration area windows provided with 1″ insulated Okalux light diffusing glass

Project Highlights