DSC_0066

Southeastern Regional Vocational Technical High School | South Easton, MA

  • Owner
    Town of South Easton, MA
  • Architect
    Drummey Rosane Anderson, Inc. | Waltham, MA
  • General Contractor
    W.T. Rich Company | Newton, MA
  • Lockheed Window Corp. Project Manager
    John Kroll

This multifaceted project included the construction of a new gymnasium, a minor addition, and renovations to an existing building. The gymnasium construction required multiple mobilizations on Lockheed’s part, as some of the work needed to be done in the summer while the school was closed. The logistics were challenging as many different products were used, and Lockheed’s expertise in that area proved invaluable. All windows, doors, skylights and panels were professionally installed by Lockheed Window’s installation crew.

Installed components included:

  • Windows in the existing building were all replaced with EFCO 325 windows
  • All storefront and entrances to new and existing buildings were installed or renovated
  • Installation of EFCO 406 storefront system and EFCO 502 thermal door
  • Wasco Skylights also installed, as well as two CPI Daylighting translucent canopies

Project Highlights