Slocomb Windows and Doors, Inc. has taken over ownership of Residential operations,
allowing Lockheed to expand our commercial Division.


For more information regarding the transition visit this page.
For dealer login information, please follow this link.
Note that all Slocomb orders must be placed through this dealer login until February 23rd, 2018 at 5pm.

Tewksbury Memorial High School | Tewksbury, MA

  • Owner
    Town of Tewksbury, MA
  • Architect
    SMMA | Cambridge, MA
  • General Contractor
    CTA Ventures | Waltham, MA
  • Lockheed Window Corp. Project Manager
    John Kroll

The construction of the new Tewksbury Memorial High School has been completed. The owner is the town of Tewksbury, Massachusetts. The Architect was SMMA of Cambridge, MA and the General Contractor was CTA Ventures of Waltham, MA.

  • EFCO 325 Project-out Window Systems utilized at approximately 175 punched window openings
  • EFCO 5600 2 1/4″ Curtainwall System provided at numerous locations throughout the project including 11 roof monitors and the (3) highlighted greenhouses shown above
  • 33 entrance frames which consisted of 58 EFCO D518 door leafs with hardware supplied by Lockheed Window Corp.
  • All aluminum framing painted with PPG 70% Kynar paint, in the approved custom color matching Benjamin Moore “Bennington Gray”
  • MI insulated glass provided was manufactured utilizing the PPG Solarban 70XL Low “E” coating

Project Highlights